Most recently collected
-
(196) EPU/MAKMAL/26-27 PROVISION OF ISO/IEC 17025:2017 SURVEILLANCE AUDIT AND LOGISTICS ARRANGEMENT FOR WATER SERVICES LABORATORY, DEPARTMENT OF WATER SERVICES (FSR), 2026
Public Works Department (JKR), Brunei · Brunei · (196) EPU/MAKMAL/26-27 (REQUOTE)
Shown in the language the agency published it in.
-
(282) EPU/SUPPLY/TRANS/26-27 RECTIFICATION, CONSTRUCTION OF PIPELINE SUPPORTS, DRAINAGE IMPROVEMENT AND PROTECTIVE COATING WORKS TO EXISTING TRANSMISSION PIPELINE AT KM 105, LEBUHRAYA MUARA-TUTONG
Public Works Department (JKR), Brunei · Brunei · (282) EPU/SUPPLY/TRANS/26-27
Shown in the language the agency published it in.
-
EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF KUMBANG PASANG DRAINAGE PUMPING STATION. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/110
Shown in the language the agency published it in.
-
EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF ASSARRA DRAINAGE PUMPING STATION. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/108
Shown in the language the agency published it in.
-
SUPPLY AND DELIVERY OF SUBMERSIBLE SEWAGE PUMPS AND REINFORCED FLEXIBLE HOSES TO PWD SEWERAGE STORE, GADONG. Closing Date : 26/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/SEW/Q/2026-27/116
Shown in the language the agency published it in.
-
SEARCH, LOCATE, TRACE AND VERIFY EXISTING ELECTRICAL SUPPLY TO SEWERAGE PUMPING STATION, MUA SPS 7. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/SEW/Q/2026-27/102
Shown in the language the agency published it in.
-
PENAMBAHBAIKAN RANGKAIAN SISTEM PAIP AIR UTAMA DAN TANGKI-TANGKI AIR BAGI SEMUA DAERAH : PAIP AIR UTAMA INLET KE TANGKI UTAMA MELABAU, DAERAH BRUNEI DAN MUARA CLOSING DATE : 03/11/2026 @ 2.00PM
Public Works Department (JKR), Brunei · Brunei · JKR/DWS/016/2026
Shown in the language the agency published it in.
-
EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF MENGLAIT DRAINAGE PUMPING STATION. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/111
Shown in the language the agency published it in.
-
EIGHTEEN (18) MONTHS TERM CONTRACT FOR OPERATION AND MAINTENANCE OF BURONG PINGAI DRAINAGE PUMPING STATION. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/112
Shown in the language the agency published it in.
-
(277) EPU/SUPPLY/M&E/26-27 SUPPLY OF PRINTER INK FOR SUPPLY AND E&P UNIT
Public Works Department (JKR), Brunei · Brunei · (277) EPU/SUPPLY/M&E/26-27
Shown in the language the agency published it in.
-
KERJA-KERJA PENGUBAHSUAIAN SISTEM UNDERDRAIN PENAPIS DI LOJI RAWATAN AIR BUKIT BARUN PERINGKAT 4 TUTONG, JABATAN PERKHIDMATAN AIR CLOSING DATE : 03/11/2026 @ 2.00 PM
Public Works Department (JKR), Brunei · Brunei · JKR/DWS/026/2026
Shown in the language the agency published it in.
-
TO REPAIR ONE (1) UNIT HD INTEGRA REVERSE OSMOSIS WATER TREATMENT SYSTEM AT WARD 17 & 18, HOSPITAL RIPAS
Ministry of Health · Brunei · closes 30 Oct 2026 · BME/A2K/(1750)/2026/HTD (B8)
Shown in the language the agency published it in.
-
TO SUPPLY AND DELIVER VARIOUS PRINTER INK, TONER, CARTRIDGES AND ACCESSORY FOR DEPARTMENT OF LABORATORY SERVICES, MINISTRY OF HEALTH FOR A PERIOD OF THREE (3) YEARS USAGE
Ministry of Health · Brunei · closes 12 Oct 2026 · KK/219/2026/LAB(TC)
Shown in the language the agency published it in.
-
(259) EPU/PRO/26-27 SUPPLY AND DELIVERY OF ALUMINIUM SULPHATE TO STAGE 5 BUKIT BARUN WATER TREATMENT PLANT – BATCH 46
Public Works Department (JKR), Brunei · Brunei · (259) EPU/PRO/26-27
Shown in the language the agency published it in.
-
(251) EPU/PRO/26-27 SUPPLY AND DELIVERY OF SODIUM SILICOFLUORIDE TO SINARUBAI CHEMICAL STORE AND WATER TREATMENT PLANTS, NEGARA BRUNEI DARUSSALAM – BATCH 10
Public Works Department (JKR), Brunei · Brunei · (251) EPU/PRO/26-27 (RECALL)
Shown in the language the agency published it in.
-
(273) EPU/PRO/26-27 TO TRANSPORT CHEMICALS FOR WATER TREATMENT FROM SINARUBAI AND TASEK STORES TO ALL WATER TREATMENT PLANTS IN NEGARA BRUNEI DARUSSALAM (FSR), 2026 (PART 1)
Public Works Department (JKR), Brunei · Brunei · (273) EPU/PRO/26-27
Shown in the language the agency published it in.
-
(274) EPU/LMMU/A/09-2026-2027 LORAWAN IOT SMART DEVICES – RENEWAL OF IOT NETWORK COVERAGE, DASHBOARD LICENSE AND MAINTENANCE (2026-2027)
Public Works Department (JKR), Brunei · Brunei · (274) EPU/LMMU/A/09-2026-2027
Shown in the language the agency published it in.
-
(275) EPU/SUPPLY(TRN)26-27 (RFQ) REQUEST FOR QUOTATION (RFQ) TO PREPARE TENDER FOR DESALINATION PROJECT – PHASE 1 AND 6 MONTHS RAW WATER QUALITY STUDY
Public Works Department (JKR), Brunei · Brunei · (275) EPU/SUPPLY(TRN)26-27 (RFQ)
Shown in the language the agency published it in.
-
TEN (10) MONTHS TERM CONTRACT FOR THE PROVISION OF CCTV MONITORING SERVICES FOR SIXTEEN (16) PUMP STATIONS IN BRUNEI-MUARA, TUTONG AND TEMBURONG DISTRICTS. Closing Date : 19/10/2026
Public Works Department (JKR), Brunei · Brunei · PWD/DDS/CDE/Q/2026-27/115
Shown in the language the agency published it in.
-
(263) EPU/PRO/26-27 SUPPLY AND DELIVERY OF ALUMINIUM SULPHATE TO MANGKUBAU WATER TREATMENT PLANT – BATCH 46
Public Works Department (JKR), Brunei · Brunei · (263) EPU/PRO/26-27
Shown in the language the agency published it in.