No closing date published
Water
TERM CONTRACTOR FOR OPERATION AND MAINTENANCE OF SERIA WATER TREATMENT PLANT AND BADAS RAW WATER PUMP STATION STAGE 4 IN BELAIT DISTRICT FOR 36 MONTHS. KONTRAK PENGGAL OPERASI DAN PENYELENGGARAAN LOJI RAWATAN AIR SERIA DAN STESEN PAM AIR MENTAH BADAS PERINGKAT 4 DAERAH BELAIT UNTUK 36 BULAN. LAST DATE OF COLLECTING DOCUMENTS AND TIME : 27/10/2026 @ 03.00 PM
Shown in the language the agency published it in. No English translation is available.
- Agency
- Public Works Department (JKR), Brunei
- Market
- Brunei
- Reference
- JKR/DBSKB030/2026
- Published
- 15 Oct 2026
Source
Collected from brunei_pwd. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 1 day ago. When this source last ran.