Closed
Power
Installation of 21 MW Grid-tied Solar Photovoltaic System in Addu City, Fuvahmulah City, Kulhudhuffushi City, GDh. Thinadhoo, B. Eydhafushi and Lh. Hinnavaru under Design, Build, Finance, Own, Operate, and Transfer Basis Installation of 21 MW Grid-tied Solar Photovoltaic System in Addu City, Fuvahmulah City, Kulhudhuffushi City, GDh. Thinadhoo, B. Eydhafushi and Lh. Hinnavaru under Design, Build, Finance, Own, Operate, and Transfer Basis
Shown in the language the agency published it in. No English translation is available.
- Agency
- Ministry of Environment
- Market
- Maldives
- Reference
- TES/2019/W-146
- Category
- Renewable Energy
- Published
- 1 Feb 2020
- Closes
- 19 Aug 2020, 08:00 add to calendar
Source
Collected from finance_mv. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 1 week ago. When this source last ran.