BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//tenders.watch//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VEVENT
UID:YCGzbI6noY@tenders.watch
DTSTAMP:20261019T001256Z
DTSTART:20261028T030000Z
DTEND:20261028T033000Z
SUMMARY:Tender closes: Supply\, construction and installation of the 220kV 
 bay isolation equipment system for Pha Lai Thermal Power Plant
DESCRIPTION:Reference: IB2600506318\nAgency: Công ty cổ phần Nhiệt Ä
 ‘iện Phả Lại\nDetails: https://tenders.watch/t/YCGzbI6noY/supply-con
 struction-and-installation-of-the-220kv-bay-isolation-equipment-syste?utm_
 medium=calendar&utm_source=ics&utm_campaign=tender-deadline\nOriginal noti
 ce: https://muasamcong.mpi.gov.vn/web/guest/contractor-selection?p_p_id=eg
 pportalcontractorselectionv2_WAR_egpportalcontractorselectionv2&p_p_lifecy
 cle=0&p_p_state=normal&p_p_mode=view&_egpportalcontractorselectionv2_WAR_e
 gpportalcontractorselectionv2_render=detail-v2&type=es-notify-contractor&s
 tepCode=notify-contractor-step-1-tbmt&id=4c0081d1-faec-43a3-85b0-971474129
 8a6&notifyId=4c0081d1-faec-43a3-85b0-9714741298a6&processApply=LDT&bidMode
 =1_MTHS&notifyNo=IB2600506318&planNo=PL2600257668&step=tbmt&isInternet=1&b
 idForm=DTRR
URL:https://tenders.watch/t/YCGzbI6noY/supply-construction-and-installation
 -of-the-220kv-bay-isolation-equipment-syste?utm_medium=calendar&utm_source
 =ics&utm_campaign=tender-deadline
LOCATION:Công ty cổ phần Nhiệt điện Phả Lại\, Vietnam
STATUS:CONFIRMED
TRANSP:TRANSPARENT
BEGIN:VALARM
TRIGGER:-P2D
ACTION:DISPLAY
DESCRIPTION:Closes in 2 days: Supply\, construction and installation of the
  220kV bay isolation equipment system for Pha Lai Thermal Power Plant
END:VALARM
END:VEVENT
END:VCALENDAR
