Closed
Water
CONSTRUCTION OF DRAINAGE SYSTEM AT PUROK 4, BRGY. TIBULOY, TORIL DISTRICT, DAVAO CITY
Shown in the language the agency published it in. No English translation is available.
- Agency
- BARANGAY TIBULOY, DAVAO CITY
- Market
- Philippines
- Reference
- 072026-72
- Category
- Construction Projects
- Published
- 7 Oct 2026
- Closes
- 14 Oct 2026, 14:00 add to calendar
- Estimated value
- PHP 1,212,427.80
Description
Minimum Equipment Requirement 1 Backhoe w/ Breaker 1 Mini Dumptruck 1 Plate Compactor 1 Backhoe, PC-60 1 Concrete Mixer (1 Bagger) Description Part A. General Requirements B.5 Billboard B.7(2) Constructioon Safety and Health 626(1) Warning and Hazard Signs Part B. Drainage System 102 Surplus Common Excavation 103(3) Foundation Fill 405 Structural Concrete, Class A a.) Manual Mixing 500 Reinforced Concrete Pipe Culvert, RCPC 505 Stone Masonry
Source
Collected from philgeps. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 1 day ago. When this source last ran.