Notice regarding (No. 2230 PC A.K) the demolition of the old stone fence, length 102m; construction of the entrance gate and front fence, height 2.5m, length 47.5m; and arrangement of khuen along both sides of the road, length 400m, at Kampong Speu Substation (GS13); construction of a guard post, size (3 x 4)m, at Kampong Speu Substation (GS13), Po Chin Tong Substation (GS53), and Aoy Saom Substation (GS22); construction of reinforced concrete fence, thickness 0.20m, height 0.80
- Agency
- Électricité du Cambodge
- Market
- Cambodia
- Published
- 4 Aug 2025
- Closes
- 1 Sep 2025, 17:00 add to calendar
Source
Collected from edc_kh. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 3 days ago. When this source last ran.