tenders.watch
Closed Power Water

Notice regarding (No. 2230 PC A.K) the demolition of the old stone fence, length 102m; construction of the entrance gate and front fence, height 2.5m, length 47.5m; and arrangement of khuen along both sides of the road, length 400m, at Kampong Speu Substation (GS13); construction of a guard post, size (3 x 4)m, at Kampong Speu Substation (GS13), Po Chin Tong Substation (GS53), and Aoy Saom Substation (GS22); construction of reinforced concrete fence, thickness 0.20m, height 0.80

Agency
Électricité du Cambodge
Market
Cambodia
Published
4 Aug 2025
Closes
1 Sep 2025, 17:00 add to calendar

Source

Collected from edc_kh. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.

Open the original notice

Last changed 3 days ago. When this source last ran.