Closed
DESIGN, SUPPLY, DELIVER, INSTALL, TEST, COMMISSION AND GUARANTEE THE PERFORMANCE ONE (1) UNIT 50MT/HR WATER TUBE BOILER, FEED PUMPS, THERMAL DEARATOR, MULTI CYCLONE DUST COLLECTORS, ELECTROSTATIC PR
Shown in the language the agency published it in. No English translation is available.
- Agency
- FGV Holdings Berhad
- Market
- Malaysia
- Reference
- F240002909
- Published
- 19 Dec 2024
- Closes
- 20 Jan 2025, 15:59 add to calendar
Description
DESIGN, SUPPLY, DELIVER, INSTALL, TEST, COMMISSION AND GUARANTEE THE PERFORMANCE ONE (1) UNIT 50MT/HR WATER TUBE BOILER, FEED PUMPS, THERMAL DEARATOR, MULTI CYCLONE DUST COLLECTORS, ELECTROSTATIC PRECIPITATOR SYSTEM (ESP) THAT MEETS THE REQUIREMENTS OF ENVIRONMENTAL QUALITY (CLEAN AIR) REGULATION 2014, NEW BUILDING C/W CONTROL ROOM AND ANCILLARY WORKS OF MECHANICAL & ELECTRICAL FOR KECHAU B PALM OIL MILL.
Source
Collected from fgv_my. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 8 hours ago. When this source last ran.