Closed
Power
TES/2019/W-01-Installation of 5MW Grid-tied Solar Photovoltaic System in the Greater Malé Region under Design, Build, Finance, Own, Operate, and Transfer Basis TES/2019/W-01-Installation of 5MW Grid-tied Solar Photovoltaic System in the Greater Malé Region under Design, Build, Finance, Own, Operate, and Transfer Basis
- Market
- Maldives
- Reference
- (IUL)13-K/13/2019/23
- Published
- 27 Jan 2019
- Closes
- 24 Mar 2019, 19:00 add to calendar
Source
Collected from finance_mv. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 1 week ago. When this source last ran.